Schedule integration

 

The Schedule Integration module is intended to manage the acquisition of time programs by scheduling tools normally used in order to have in Bridge a "normalized" environment containing information and the time data of each program acquired.

This "standard environment" is made available for all modules of the system to allow the connection of the entities already defined in each module with the activities of the program and to render “dynamic” the timing of the entities themselves (time phasing).

The main features of this module will allow you:

  • to create an environment designed to contain a program, linking it with its file processed by the scheduler system;
  • to carry out the first load of program's data (the activities and information related);
  • to map fields defined into the "scheduling system" with the fields defined into the "scheduling interface environment" in order to create a link between them;
  • to make available for every module of the system the data contained into the "scheduling interface environment" in order to perform the timing of the defined entities;
  • the dynamic rendering of the time positioning of the values present in different functional modules of Bridge through automatic procedures of "date realignement" (timing).

SNAPSHOTS

Search

Our Company

PIEMME GROUP S.R.L.

Via G. Carducci 5/4 sc. sn - 16121 GENOVA
Tel. 010 40 75 751 - Fax 010 40 74 447
email pm@gruppopm.com
Cod. Fisc. e Partita IVA 03171000106
R.E.A. GE 323875 - Reg. Imprese GE 53691
 
The company was founded in 1984 and since then has been working exclusively in Project & Construction Management.

In 1993 Piemme joint-ventured with the American company O’Brien & Kreitzberg (world leader in pure Project & Construction Management) acquiring skills, methodologies and the most advanced support tools that later constituted the Bridge platform.

Visit Us


View Larger Map